Construction of Estonian Cell wastewater treatment plant (Estonian Cell AS)

2013
  • Electrical installation works
  • Heavy current works
  • Automation works
  • Delivery of 690/400 V, 400 kVA, IP31 low voltage dry-type transformer

Renovation of Estonian Cell substation (Estonian Cell AS)

2013
  • Dismantling the existing 690 V, 3000 A switcgear and busbar trunking system
  • Dismantling the existing medium voltage transformer
  • Installing a new 690 V, 5000 A switchgear and busbar trunking system
  • Installing a new medium voltage transformer

O-I Production Estonia AS (Järvakandi Glass Factory)

2010
  • Preparing a project for the remote reading system of gas and electricity consumption in the glass factory
  • Heavy current works
  • Weak current works
  • Installing grid analysers
  • Automation works
  • Building the remote reading system

O-I Production Estonia AS (Järvakandi Glass Factory)

2009
  • Preparing a project for renovating electrical installations of the mixture plant and weight conveyor
  • Heavy current works
  • Electrical installation works
  • Automation works

O-I Production Estonia AS (Järvakandi Glass Factory)

2008
  • Separating and connecting production lines (heavy current and automation works)

O-I Production Estonia AS (Järvakandi Glass Factory)

2007
  • Electrical installation works