Construction of Viimsi water treatment plant (Viimsi Vesi AS)

2011
  • Heavy current works
  • Electrical installation works
  • Automation works

O-I Production Estonia AS (Järvakandi Glass Factory)

2010
  • Preparing a project for the remote reading system of gas and electricity consumption in the glass factory
  • Heavy current works
  • Weak current works
  • Installing grid analysers
  • Automation works
  • Building the remote reading system

Mõigu pumping station

2009
  • Electrical installation works
  • Weak current works
  • Automation works

O-I Production Estonia AS (Järvakandi Glass Factory)

2009
  • Preparing a project for renovating electrical installations of the mixture plant and weight conveyor
  • Heavy current works
  • Electrical installation works
  • Automation works

Construction of Paide 2.1 MW combined heat and power cogeneration plant fuelled by woodchips (Eesti Energia AS)

2013
  • Medium voltage works, at rated voltage 10.5 kV
  • Electrical installation works
  • Automation works
  • Building the fire detection and alarm system (ATS)

Construction of Narva Water Treatment Plant

2014
  • Electrical installation works of the technological part
  • Installation works of automation