O-I Production Estonia AS (Järvakandi Glass Factory)

2009
  • Preparing a project for renovating electrical installations of the mixture plant and weight conveyor
  • Heavy current works
  • Electrical installation works
  • Automation works

O-I Production Estonia AS (Järvakandi Glass Factory)

2008
  • Separating and connecting production lines (heavy current and automation works)

O-I Production Estonia AS (Järvakandi Glass Factory)

2007
  • Electrical installation works

Construction of Paide 2.1 MW combined heat and power cogeneration plant fuelled by woodchips (Eesti Energia AS)

2013
  • Medium voltage works, at rated voltage 10.5 kV
  • Electrical installation works
  • Automation works
  • Building the fire detection and alarm system (ATS)

Construction of Rakvere 5.6 MW ORC combined heat and power cogeneration plant fuelled by woodchips, stage II (Adven Eesti AS)

2014
  • Delivery and installation of two 2x325 kVar, cos(fi)=0.99 capacitor sets
  • Delivery and installation of 690 V, 2500 A busbar trunking system
  • Electrical installation works
  • Installation works of automation

Construction of Narva Water Treatment Plant

2014
  • Electrical installation works of the technological part
  • Installation works of automation